Welcome
Welcome to the applied research project entitled: Capacity increment of the welding laboratory аt Nikola Vaptsarov Naval Academy
Project aim: Enhancement of the laboratory capabilities by: Creating additional workplaces (welding posts) equipped with TIG welding machines, thus increasing the range of the welding methods covered by the laboratory.
Members of the team:
- Commander Hristo Valeriev Hristov, PhD, Chief Assistant at the Department of Ship Repairs
- Assoc. Prof. Georgi Kanchev Lyutskanov, PhD, Head of the Department of Ship Repairs
- Captain (N) Yulian Vasilev Moskov, Assoc. Prof., PhD, at the Department of Ship Repairs
- Lieutenant Commander Momchil Galinov Manov, PhD, Chief Assistant Professor at the Department of Ship Repairs
- Assistant Kalin Georgiev Lyutskanov, Assistant Professor at the Department of Ship Repairs and doctoral student
- Assistant Dimitar Vasilev Vasilev, Assistant Professor at the Department of Ship Repairs
- Cadet Victor Karov, fifth-year student
- Assoc. Prof. Plamen Dichev Dichev, PhD, Dean of the Faculty of Shipbuilding at the Technical University, as consultant
Project duration: 01.01.2018 – 28.02.2018
Tasks:
- Design of the location of the equipment in the welding laboratory after the purchase;
- Installation and calibration of the new equipment;
- Development of procedures for working with the new equipment;
- Development of instructions for HSE protection;
- Development of a methodology for conducting laboratory exercises;
- Testing of the new equipment;
- Reporting the results of the project implementation.
Work program
№ of tasks |
Duration in months |
|
1 | 2 | |
1. Design of the location of the equipment in the welding laboratory after the purchase | ||
2. Installation and calibration of the new equipment | ||
3. Development of procedures for working with the new equipment | ||
4. Development of instructions for HSE protection | ||
5. Development of a methodology for conducting laboratory exercises for welding | ||
6. Testing of the new equipment. | ||
7. Reporting the results of the project implementation |